Skip to main content

Carbon Inventories, Scope, and Revisions

Open Carbon Inventories → New. Enter code, name, reporting year, dates, organizational boundary method, and description. Select operational control, financial control, or equity share according to your policy. Use DEMO / TEST for trial data. Company and year identify a family of revisions. Activities are evaluated by company, branch, period, scope, and latest results rather than manually attached one at a time.

Organizational scope​

In Organizational Scope, add company-wide or branch units and record inclusion or reasoned exclusion. For included equity-share units, enter ownership above 0% and at most 100%. Record entry and exit dates for changes during the year. Verify the table and missing ownership warnings.

Control methods consolidate included emissions according to their boundary rules. Equity share weights by ownership. Fully outside activities are excluded, and partial overlaps can require review. Split periods appropriately.

An included activity must be active, cleared of duplicates, in scope and period, finally classified with current inputs, and successfully calculated. Review Included Activities and Problematic and Excluded Records. Critical gaps block approval.

For Scope 2, record Dual Reporting. Required needs both results for each eligible activity. Not Applicable needs a reason. For Scope 3, decide Relevant, Relevant with Missing Data, or Excluded with Reason for all 15 categories. See Scope 3.

ActionEffect
DraftEdit header, scope, and decisions with live consolidation
Submit for ReviewLock header, scope, and decisions
Return to DraftReopen for correction with a reason
Approve InventoryRecheck blockers and freeze totals and activity, factor, and calculation basis
CloseProtect approved period activities. Requires separate permission and a reason.
New RevisionPreserve the approved version, inherit scope, and reevaluate live data in a new draft

Review Post-Approval Changes for new, cancelled, or corrected activities and factor or classification changes. Uncalculated current records can prevent a reliable variance. For a corrected bill, fix the activity or ERP source and resynchronize as applicable. Create a reasoned revision. Only one draft per family is allowed. Approve it to replace the current approved version and download the correct revision. Earlier snapshots remain.