Manufacturing Accounting Cutover and Activation
Prepare accounts and review readiness
Set a General production journal, WIP asset account, operation absorption, abnormal scrap expense and cost variance where applicable. Verify inventory valuation and category mappings for the company.
- Set the cutover date in company local time.
- Recheck readiness and resolve findings. Review unknown historical values and document exclusions.
- Enter the reconciliation evidence reference and approve the cutover.
- Open the activation window at the appropriate time. Accounting-relevant production movements pause during this window.
- Recheck readiness and enable manufacturing accounting. If deferring, cancel the activation window explicitly.
Cancelling the window returns the cutover to approved, and a new window is required later. An eligible reset removes approval while preserving journals. If approval is stale, rerun readiness and approval. Once production entries exist or the cutover is active, deactivation and reset are restricted. Inspect required manufacturing-side settings if movements are blocked. Use the Control Center to verify unposted events, WIP and corrections.