Skip to main content

Journal Entries and Manual Posting

Read the journal​

Open Journal Entries in the active company. Check journal, number, posting date, description, reference, status and any source link. Lines show account, partner, debit or credit, transaction currency and amount, rate and due date. Only one side of a line may be positive. Posted totals must balance in the company currency.

Save and post a manual entry​

  1. Open Journal Entries → New. Select an active General journal and unlocked posting date.
  2. Enter the reference and at least two valid lines with eligible active accounts. Receivable and payable accounts require a partner.
  3. For foreign currency, verify the signed transaction amount, rate and company equivalent. Company-currency entries use rate 1. Respect any account currency restriction.
  4. Select Save Draft and review the totals. An unbalanced draft can be saved if its individual lines are valid.
  5. From the saved detail, use its separate posting action. Posting checks the date, journal, account, partner, currency and positive balanced totals again.

Drafts neither create open items nor enter posted reports. Eligible receivable or payable lines produce open items at posting. Use manual entries for genuine manual accounting events. Post invoices, payments and stock operations through their source workflows. Use an eligible manual reversal only for an entry without a linked source.

Add activities, notes or files​

Open the activities panel on a saved entry. View permission allows reading planned work and history. Accounting management permission allows scheduling, adding internal notes or attachments, and completing or cancelling activities. This works on posted entries and leaves their accounting lines intact. Verify the result in the same panel.

Compare posting status, totals and source with Accounting Reports and Open Items.