PCF Operation Energy and Energy Profiles

Open Settings → Energy Profiles → New. Link a work center or enter a code and name. Enter setup, run, and shutdown power in kW. Use zero only for a phase known to be absent. Validity must cover the study. Record source type, evidence, description, and optionally an eligible approved location factor. Save and verify active status.

Under Operation Energy, enter reference batch output and unit. Choose actual work order durations from a completed order where eligible. Review and save the preview. Phase energy equals kW × minutes ÷ 60, scaled to reference output. Different phase powers require separate durations. The system can fall back to planned time without them. Check the formula.

For manual operations, enter operation and center references. Measured kWh requires batch output, in-period date, and a unique evidence reference. Profile is optional for measurement. Planned time requires a profile, phase durations, output, and evidence. A linked CCF activity can be used once per study. Measurement can replace an estimate for the same operation. Check preview changes and avoid duplicate PCF inputs.

Verify kWh per reference output, duration method, validity, factor, and overlap. Refresh energy and recalculate after changing the power or time source.