Partial Production, Work in Progress and Backorders
Move eligible remaining production
If 60 of a planned 100 have been received, 40 remain. Reporting 60 without a physical receipt is insufficient for backorder creation. Continue on the same order or, where eligible, use Create Order for Remainder on the in-progress order.
The output received must be positive and below plan. The order must be eligible in the production hierarchy, with no open linked child orders or cancelled required operations. Valid warehouse context and Inventory integration are required. Review the preview for new quantity, carried and remaining operations, material coverage, by-products and consumption deviations. Confirm required deviations before transferring.
Check what carries over
The new order uses the source’s frozen definitions, candidate centers, dependencies and policy, scaled for the remaining plan. Eligible work progress and material coverage can carry over without new physical output or consumption. Source movements, recorded time and operator sessions remain on the source. Unused reservations are released and the new order reserves its own remainder.
The source closes with Closed by Backorder. Completed work remains complete and open work closes through transfer. Reopen the linked new order to work on the remainder. Later eligible backorders are considered on that order. Work-in-progress scrap can reduce usable progress. After backorder closure, source physical corrections are blocked.
Verify cost transfer
Compare planned, received and remaining quantities, carried and actual progress, and reservations. Backorder Cost Transfer shows eligible material and recorded operation costs retained or transferred. This does not consume stock a second time. Closure can trigger eligible source-output reconciliation. Older quantity carry-over can lack reliable monetary evidence. Check Cost and Manufacturing Accounting.