Finished Goods, By-product Receipts and Completion
Check capacity
Work-order reporting records progress. Receive Finished Goods creates the physical receipt. The order header’s received quantity is based on receipts.
The planned quantity caps total receipt. With operations, the least available progress among required jobs limits it. A cancelled required job blocks it. Strict consumption additionally limits capacity by effective component consumption. Flexible policies relax this consumption ratio limit. For orders without operations, the plan and applicable consumption rules determine capacity. Available to Receive Now subtracts prior receipts. Saving rechecks the amount.
Receive finished goods and by-products
Open the order’s stock section or its Shop Floor actions. Enter a positive quantity and review the preview and required tracking or expiry data. Confirm the receipt into the production warehouse’s Stock location. Use a separate transfer if another warehouse is needed. Material issue is separate.
For lot tracking, use an eligible active lot or create one. An existing lot’s expiration date must match. Serial-tracked main output is received one unit at a time with an unused serial. Quantity-only output uses no lot or serial.
Frozen by-products scale with cumulative output and, when linked, operation progress. The preview shows the new by-product quantities for the same receipt. Enter the required lots or unique serials. Invalid by-product data blocks the whole receipt. Check by-product quantities in the order and movements.
Complete and verify valuation
Complete Production checks full planned receipt, required jobs and consistency. Strict consumption requires the full component need. Flexible policies handle deviations, and the warning policy requires confirmation. Completion releases remaining reservations and closes the order. It can allocate recorded operation costs and applicable residual costs without generating another physical movement. For eligible partial production, use Backorders.
Materials value can include actual valued issues, normal scrap and eligible carry-over. Under progress-based costing, partial main receipts can include recorded operation cost. By-product shares are frozen at approval and their operation share is evaluated at closure. With manufacturing accounting active, eligible inventory receipts debit finished stock and credit WIP. A required posting failure rolls the receipt back. Verify the Cost and Accounting tabs and any remaining difference.