Work Orders and Production Reporting

Start and run work​

Open a work order from Manufacturing or the production order’s Operations tab. Shop Floor shows the same work. Work orders are created from applicable operations.

Start an eligible ready job after its predecessors complete and required operation and general materials are covered by consumption, carry-over and reservations. Expected supply and unreserved on-hand stock do not substitute for readiness. Starting opens a work-center time segment and advances the production order. A back-office start does not open a personal operator session.

Pause closes the active center segment. Resume rechecks prerequisites and materials. A pause does not release reservations or planned resource occupancy.

Report additional production​

Enter the quantity produced in this report. For example, with 40 already reported and 20 newly produced, enter 20 to reach 60. The remaining plan and dependency capacity limit reporting. Partial reporting keeps the work open. Available progress is carry-over plus reported actual output minus work-in-progress scrap. Reaching the plan completes the job.

Report progress separately from finished goods receipt. A blocking quality check can prevent reporting or receipt. Work-center time and personal operator sessions are separate measures. Review frozen instructions, time, reported and carried quantities, scrap and physical movements. See Scrap and Corrections for progress loss.