Material Preparation, Reservation and Consumption
Check material readiness
The approved bill snapshot sets component requirements. Read planned, reserved, consumed, carried-over and remaining quantities separately. Approval reserves eligible available stock when Inventory is active. Shortages can leave partial or zero reservations. Prepare Materials reserves newly available stock for the remaining requirement. Other operations’ reservations are protected.
To start a work order, applicable operation and general components need coverage from eligible consumption or carry-over plus reservations. Expected supply and unreserved stock do not count as prepared coverage. If the stock integration is inactive, material availability may be unverified.
Consume materials
On the component line enter a positive quantity and select Consume. The reservation area can consume remaining eligible reservations in a batch. Shop Floor can issue eligible operation and general components. Successful consumption produces a completed movement from the warehouse’s source location to production, uses the related reservation and records the issue. The line quantity converts to the base stock unit.
| Copied policy | Effect |
|---|---|
| Blocked | Consumption cannot exceed plan, sufficient reservation is required, and completion checks full consumption. |
| Allowed | Consumption can exceed plan using eligible free stock. Completion evaluates short consumption separately. |
| Allowed with warning | Deviations require confirmation before stock changes. |
Changing the bill does not change the approved policy. Flexible consumption cannot use negative stock or another operation’s reservation. Selected or scanned lots and serials must match eligible reservations. Keep scrap separate from consumption. Check consumed, reserved and remaining quantities, the completed movement and source stock.