Replenishment Planning, Min/Max and Make to Order
Define a rule
Open Manufacturing → Settings → Replenishment Rules → New. Choose an active tracked variant and warehouse. These two identities are fixed after save. Warehouses are planned separately.
| Option | Effect |
|---|---|
| Buy or Manufacture | Explicit supply method |
| Make to Stock | Projects inventory using minimum and maximum stock |
| Make to Order | Links supply to confirmed sales lines or dependent component demand |
| Minimum and maximum | Base-unit quantities, with maximum at least minimum |
| Order multiple | Rounds suggested quantity up to that multiple |
Make to Order does not use min, max or multiple and does not treat on-hand inventory as free coverage for that demand. Maintain lead time and eligible suppliers or bills in master data. An active rule defines the supply method.
Run and verify planning
Choose warehouse and horizon, then run planning. Review added, updated and removed proposals and issues. Compare opening, committed and planned supply, demand, dependent demand and closing quantities by day. The requirement date is when stock is needed. The launch date subtracts the lead time. A past start date indicates a delay.
Pin to protect a proposal, unpin to include it in replanning, reject to stop that proposal, or convert it to an eligible purchasing or manufacturing draft with the relevant permissions. Review the linked document, quantity, warehouse, supplier or bill and demand. Use its normal approval flow. Check Planning Issues for missing setup and rerun after corrections. Work-center capacity is reviewed separately in Planning.