Skip to main content

Manufacturing Traceability

Follow the order and tracking identifiers​

Open the manufacturing order’s Traceability section. Review completed material issues and finished goods or by-product receipts by product, variant, lot or serial, quantity and movement. A planned component is distinct from a completed issue.

In Manufacturing Traceability, search by lot, serial or order. For a finished item, follow How Was It Made? to the order and materials. For a component, follow Where Was It Used? to orders and outputs. These are order-level links. Several materials and receipts in one order do not establish one-to-one lot allocation.

Verify corrections and cost​

Component scrap is tracked separately from material use. Corrections can show original, corrected and net quantities while preserving movement history. A backorder carry-over represents credit from the previous order. Compare base units and source conversion before interpreting the displayed quantity. If a search gives no result, check company, scope and completion state.

Compare physical movements with the order’s output targets, value allocations, cost transfer and residual difference. Follow related journals from the Accounting tab with source permissions. Use WIP reconciliation for the financial balance. See Cost and Manufacturing Accounting.